Help Decide the Future of the Gardiner Expressway East
The Project: Waterfront Toronto and the City of Toronto have resumed the preparation of the Gardiner Expressway / Lake Shore Boulevard Reconfiguration Environmental Assessment (EA) and Integrated Urban Design Study. The EA will determine the future of the Gardiner Expressway East and Lake Shore Boulevard East, from approximately Jarvis Street and east of the Don Valley Parkway. Four alternatives will be considered within the study area, including: maintaining, improving, replacing, or removing the elevated expressway.